By LCN Business Desk
A shop in Bridgetown that loses supply for eight hours is credited on next month's bill and never has to ask. A shop in New Amsterdam that lost a freezer in the 45-hour Canefield blackout was given half its November bill on 22 November, when President Irfaan Ali announced the cut, and nothing at all against the stock.
Both countries had a failure. Only Barbados had decided in advance what it was worth.
What did East Berbice actually get?
A discount on electricity, not a payment for what the electricity was keeping cold.
President Irfaan Ali announced the cut in a video message on Sunday 22 November. He said every customer in the affected areas would get 50 per cent off the November bill. About 15,000 of East Berbice's 39,000 customers were affected, on the corridor from Mara through New Amsterdam to Williamsburg.
For a household that is money back. For a trader it is a discount on a service that was not delivered, and the President said as much, acknowledging the cut could not reverse the financial losses and was intended as relief.
Two things a business needs from that announcement are not in it. None of the reports states whether commercial accounts are included, though "every customer" covers them on its face. And the relief was announced by the head of government for one corridor after one event, which makes it a decision rather than an entitlement. Nothing about it tells a shop in Bartica or Sophia what happens the next time.
The Berbice Chamber of Commerce and Development Association had put four demands to the utility the day before, and none of them was money.
Can a Guyanese business recover the value of spoiled stock?
One provision reaches it. It is written more broadly than anything else in the region, and it moves only on a complaint.
Section 26(1) of the Public Utilities Commission Act 2016 runs like this. The Commission must hold a hearing, on a complaint or of its own motion. If it finds the service fell short of section 25, it must order the service put right, and it "may also direct the public utility to pay to any consumer compensation for loss or damage suffered by the consumer."
Loss or damage suffered reaches the stock, the compressor and the trading day.
Barbados pays a fixed sum and its standards say in terms that compensation is based on the cost of providing service and not on any costs for damages. Great Britain pays a flat figure. Jamaica pays multiples of a service charge. Every other regime pays for the interruption. Guyana's is the only one written to pay for the harm, and the only one that pays nothing until a long process has run.
The Act fixes no sum, no cap and no deadline, the Commission may order payment rather than must, and nothing moves until somebody complains and a hearing is held. A business does not receive this. It claims it.
What would a claimant have to show?
That GPL missed its licence standard, which for 2025 the regulator has already found.
Section 25 requires a utility to provide service that is safe, adequate, efficient and reasonable. Section 25(2) then narrows it: where a licence sets a standard of service, supply "shall be deemed by the Commission… to be reasonable or adequate if the aforesaid standard or quality is achieved and maintained."
That deeming provision is why 45 hours in the dark is not, on its own, a case. GPL's licence standard is a set of annual system averages, so the question the Act asks is how the network performed over a year, not how long one street waited.
| GPL operating standard, 2025 | Target | Actual | Outcome |
|---|---|---|---|
| Interruptions per customer (SAIFI), lower is better | 85 | 86 | not achieved |
| Hours without supply per customer (SAIDI), lower is better | 80 | 84 | not achieved |
| System losses, lower is better | 22.43% | 25.84% | not achieved |
| Average availability, higher is better | 80% | 87% | achieved |
Source: the Public Utilities Commission's Operating Standards and Performance Targets table for 2025.
The Commission's press release of 27 March 2026 says eight standards were assessed and six were not met. Customer interruptions were among them, and an Order would follow by 30 April 2026. The two GPL did meet were voltage regulation and average availability. GPL said notify us and we will facilitate, and the record said eighty-two days.
So the company kept its plant available and did not keep the lights on. Both indices that count what a customer experiences, how often supply fails and for how long, were missed, which is the part of the record a claim under section 26(1) turns on. Section 25(2) protects a utility where the standard of service is achieved and maintained, and on customer interruptions in 2025 it was not.
The duration index is the line to carry into any complaint, and it has to be read for what it is. SAIDI is a system average, so it describes nobody in particular. A mean of 84 hours is equally consistent with a customer who lost eight across the year and one who lost three hundred, and the single figure is the one thing that cannot tell them apart. The Government's own register puts numbers to that spread.
Seven areas stood between 38 and 43 hours on 14 November. Canefield ran above 45 five days later. Either event on its own is more than half the year's system average.
What is a rule worth to a business that has one?
A number it can plan against.
| Trigger | Payment | Automatic? | Business covered | |
|---|---|---|---|---|
| Barbados | 8 hours | BBD 45 domestic, 90 general service, 215 large power, repeating every further 8 hours | Yes, credited to the next bill | Yes, at higher tiers |
| Trinidad and Tobago | 10 hours | TT$60 residential and commercial, TT$600 industrial, capped at two further periods | No, claim within 3 months | Yes |
| Great Britain | 12 hours, or 24 for larger incidents | £100 domestic, £195 non-domestic, then £45 per further period | Yes, and failing to pay is itself a breach | Yes, paid more |
| Jamaica | None | Not applicable | Not applicable | Not applicable |
| The Bahamas | Being written | A statutory requirement for a damage-compensation procedure, terms in consultation | Not yet determined | Not yet determined |
| Guyana | None | Unquantified, at the Commission's discretion | No, complaint and hearing | Statute says "any consumer" |
Sources: the Barbados Fair Trading Commission decision of December 2022. T&TEC's guaranteed electricity standards. The Electricity (Standards of Performance) Regulations 2015, with sums set by Ofgem. The Office of Utilities Regulation ruling for Jamaica Public Service.
What those rows buy is predictability rather than wealth. BBD 215 does not restock a cold room either. But a Barbadian operator can price an outage before it happens, and a Trinidadian one knows supply off for 34 hours is worth what supply off for a week is worth.
Jamaica chose the opposite. Its regulator stated that it "in no way attempted to categorize power outages as emergencies", and handles reliability through an annual adjustment to the allowed tariff instead. Everybody pays for unreliability in the bill, and nobody is paid for sitting in the dark. The Bahamian row is the only one still open. Bahamian law already says a supplier must have a way to pay for damage. Its regulator is now consulting on what that way must contain. Comments close at 5 p.m. on 4 December 2026. What comes out of it will set the thresholds and sums a Bahamian supplier owes, and give a Guyanese business a current regional precedent to point at.
What is the evidence of how long the power was off?
Whatever the business wrote down itself, because the national record will not supply it.
The Ministry of Public Utilities and Aviation publishes a register of service cuts covering its agencies. Each notice gives a reported time and a restored time. It is the only national record of its kind. As it stood on 23 November 2026 it held 165 GPL notices covering 2 May to 21 November, and a business building a claim would reach for it first.
It will not carry the weight. Three things are wrong with it, and each one removes a different piece of what a claimant needs.
The restored times are often clerical, not physical. The 163 notices carrying both stamps close on only 69 distinct moments. Twelve were closed at a single instant on 6 June, nine on 11 June, and seven at 9:49 on the morning of 16 November. The longest entries run to 366 hours for an upgrade at Heroes Highway and 358 for planned work in Berbice. Neither was a fifteen-day blackout. Both were notices left open and tidied in a batch. The effect is precise: the register times a short interruption plausibly and a long one not at all. A compensation threshold is a long-duration instrument, so the measurement fails exactly where a threshold would bite.
The events that would matter most to a claim are not in it. There is no notice for the East Berbice outage that began on 19 November. There is none for the 12 September failure across Demerara and Berbice. On that day GPL said ten per cent of those cut off had power back, while its own commenters named more than twenty communities still dark. The register was live throughout the Berbice blackout, carrying 25 notices timestamped between 19 and 23 November, none of them about Canefield.
And the monthly totals do not describe a steady record.
| Month, 2026 | GPL notices reported |
|---|---|
| May | 26 |
| June | 56 |
| July | 21 |
| August | 13 |
| September | 3 |
| October | 26 |
| November, to the 21st | 20 |
Source: the Ministry's register, read 23 November 2026.
September is the month of the disturbance that took out Demerara and Berbice together, and it carries three notices, dated the 2nd, the 23rd and the 28th. Whatever happened to the record that month, a business looking for proof of 12 September will not find it there.
What the register does hold is a reminder that the corridor was not singular. Seven areas went on it within four hours on 14 November, across Regions Four, Five and Six. They were Lusignan to Enmore, Ruimveldt, Mahaicony and Corentyne, Industry to Chateau Margot, Moleson Creek, Lowlands to Bygeval, and Heroes Highway through Agricola to Nandy Park. All seven were closed together on the morning of the 16th, standing in the register between 38 and 43 hours each. Four of Guyana's ten regions lost power on the morning of 30 October. One notice, for Lusignan, Enmore and Success, was reported on 21 November and still read "Expected restoration: Not yet known" two days later.
Those seven carry the batch-closing caveat in full, so they are registered hours rather than measured ones. They are nonetheless the Government's own record of seven areas interrupted for a day and a half, five days before Canefield, and no bill credit followed any of them. Relief of the kind East Berbice received is therefore not something a business elsewhere can plan around, because nothing on the record determines who receives it.
So the burden sits with the business. A complaint under section 26(1) asks the Commission to find that service fell below the standard and that a loss followed, and the national record establishes neither. Whatever a trader recorded at the time is the only evidence of its own outage that exists.
The regulator has already marked that supply as below standard. So backup power and cold-chain cover are a running cost, not a spare plan. The East Berbice credit is no reason to put either off. It was given once, to one corridor, by choice.
The entities
- Guyana Power and Light Inc. (GPL): the state electricity utility, whose Canefield Substation failure cut supply across East Berbice from 19 November 2026. - Public Utilities Commission (PUC): Guyana's utilities regulator, which assessed eight GPL operating standards for 2025 and found six were not achieved. - Public Utilities Commission Act 2016 (Act No. 19 of 2016): the governing statute, whose section 26(1) permits an order that a utility pay a consumer compensation for loss or damage, and whose section 89 repealed the previous Act. - Ministry of Public Utilities and Aviation: the ministry that publishes the national register of service interruptions. - Berbice Chamber of Commerce and Development Association: the regional business body that put four demands to GPL on 21 November 2026. - Fair Trading Commission (Barbados): the regulator whose standards of service require Barbados Light and Power to credit customers automatically after eight hours. - Office of Utilities Regulation (Jamaica): the regulator whose guaranteed standards for Jamaica Public Service contain no outage-duration trigger. - Irfaan Ali: President of Guyana, who announced the 50 per cent November bill reduction for East Berbice on 22 November 2026.
What the title card shows
8: the hours of interruption after which Barbados Light and Power must credit a customer automatically, under the Fair Trading Commission's standards of service. 10 and 12: the equivalent triggers in Trinidad and Tobago and in Great Britain. 0: the number of hours that trigger a payment in Guyana, where no duration threshold exists in law. 84: the system average hours of interruption per customer across 2025, against a licensed target of 80, on the Public Utilities Commission's own table. 6 of 8: the operating standards the Commission assessed for 2025 and found not achieved. 50 per cent: the reduction in November electricity bills announced by President Irfaan Ali for East Berbice on 22 November 2026. 165: the GPL notices in the Ministry's interruption register between 2 May and 21 November 2026, none of them recording the Canefield blackout. 4 December 2026: when comments close on the Bahamian rule setting out what an electricity supplier owes a customer when the power fails.
Frequently asked questions
Can a Guyanese business claim for stock lost in a power cut?
Section 26(1) of the Public Utilities Commission Act 2016 allows the Commission, after a hearing on a complaint or its own motion, to direct a utility to pay a consumer compensation for loss or damage suffered. It is discretionary and no sum is fixed in the Act.
Does a long outage automatically entitle a business to a payment in Guyana?
No. Guyanese law sets no number of hours that triggers a payment. Section 25(2) deems service adequate where the licensed standard is achieved and maintained, so a claim turns on the utility's performance against its licence rather than on the length of one interruption.
What did President Ali announce for East Berbice?
A 50 per cent reduction in November electricity bills for every customer in the affected areas, announced in a video message on 22 November 2026, covering the corridor from Mara through New Amsterdam to Williamsburg, where about 15,000 of 39,000 customers were affected.
How do other Caribbean countries handle this?
Barbados credits customers automatically after eight hours and repeats the payment every further eight. Trinidad and Tobago pays after ten hours on a claim made within three months, capped at two further periods. Jamaica has no outage-duration trigger at all.
What evidence should a business keep during an outage?
Its own. The Ministry's interruption register closes many notices in batches, so the recorded duration is often the age of the notice rather than the length of the outage, and it carries no notice for the East Berbice blackout of 19 November 2026.
<!-- archive: suriname-power-shortfall-solar-tender-electricity-sector-plan-2026 | read 23 Nov 2026 and not linked: it is a GENERATION shortfall, 120 to 140 megawatts by 2030, and a sector plan never adopted by decree. This piece is about what a utility owes a customer after supply has already failed. Shared word is "power" and nothing else --> <!-- archive: cruise-shore-power-caribbean-ports-grid-capacity-grenada-2026 | read 23 Nov 2026 and not linked: it is port grid CAPACITY, a docked ship drawing up to 12 megawatts against Grenada's 70. No customer redress, no interruption standard, no compensation. Shared word is "power" --> <!-- archive: guyana-development-bank-section-32-exempt-financial-institutions-act-collateral-rule-2026 | not linked: matches only on the word "section". It is bank collateral rules under the Financial Institutions Act, a different statute and a different regulator from the Public Utilities Commission --> <!-- archive: wyden-cbp-section-307-section-301-caricom-forced-labour-tariff-2026 | not linked: matches only on the word "section". It is United States forced-labour tariff provisions, nothing to do with electricity supply or utility regulation --> <!-- archive: guyana-schengen-visa-biometrics-suriname-eu-visa-code-article-8-2026 | not linked: visa biometrics and the EU Visa Code. It shares generic terms such as "act" and "commission" and carries nothing on electricity, outages or compensation -->