By LCN Business Desk
Which Berbice port is working now?
CGX Energy's, and it has a customer under contract.
Grand Canal Industrial Estates Inc. is a CGX subsidiary. It signed a port services agreement with a third-party customer, effective 15 June 2026, OilNOW reported. The customer is not named.
The agreement covers designated port capacity and six acres of storage, and runs initially to 17 July 2027. It sets a minimum monthly charge of US$64,000 before value-added tax, and a minimum annual throughput of 240,000 metric tonnes. Excess throughput and other services can earn more.
CGX had written down the port by US$17.1 million in its 17 March release. That followed revised assumptions about use and timing at the end of 2025, and CGX has not said whether the new agreement changes them.
What is being built behind it?
A private port from two shipping rivals, with first berths promised 18 months after signing.
Muneshwers Limited and John Fernandes Limited are two local shipping rivals. Through a joint venture, Cranes Guyana Inc., they are putting more than US$285 million into a port. President Irfaan Ali announced it in New Amsterdam on 12 April 2025 and said the sod-turning would follow within weeks, OilNOW reported.
The project is expected to generate about 1,000 jobs. Chandradat Chintamani, the Muneshwers general manager, said the first berths would open for transshipment 18 months after agreements are signed.
No report of the sod-turning appears on OilNOW's Berbice Port tag, which runs from April 2025 to August 2026.
What is the government building?
A deepwater port for the second gas project, costed between US$1 billion and US$2 billion.
Bechtel finished the pre-front-end design in 2023. The feasibility study is not done. The next engineering stage costs about US$50 million, and Chevron declined to carry it after acquiring Hess. What replaced it is a letter of interest, not money.
Vice President Bharrat Jagdeo speaks at the Guyana Manufacturing and Services Association dinner on 26 November 2026, the first place to hear where it now stands.
Three projects at one river, and two of their principals call theirs the deepwater facility.
The state has been paying for that river already. It bought out the Berbice bridge company this year, where buying the bridge cost G$400 million to save G$159 million at the old rate.
What does this mean for Trinidad and Jamaica?
Guyana has bought their port services for decades, and is building its own.
That reliance, for handling large cargo vessels, has driven up shipping costs and caused delays at peak periods.
The tonnage now under contract at Berbice is small against those hubs. What is planned behind it is not.
The trade is domestic Guyanese cargo that currently pays a Trinidadian or Jamaican handler. Every tonne that clears at Berbice is a tonne that does not.
<!-- archive: chta-chief-awards-2026-hotel-operating-numbers-barbados-jamaica-2026 | read 18 Nov 2026 and not linked: it reports operating figures hotels disclosed in award entries in Barbados and Jamaica. This piece is port capacity and cargo handling on the Berbice River. The shared terms are Jamaica and Trinidad, which this piece names only as the ports Guyana currently uses -->
<!-- archive: jamaica-inflation-8-2-october-utilities-transport-boj-decides-wednesday-2026 | read 18 Nov 2026 and not linked: it is Jamaican consumer inflation and a central bank rate decision. Nothing in it bears on port capacity or cargo handling -->
<!-- archive: caribbean-airlines-amadeus-breach-trinidad-no-notification-duty-jamaica-72-hours-2026 | read 18 Nov 2026 and not linked: it concerns a passenger data breach at an airline and the notification duties that follow. Shared terms are Trinidad and Jamaica only -->
<!-- archive: jamaica-odpem-melissa-donations-1-8-per-cent-spent-roof-programme-unverified-2026 | read 18 Nov 2026 and not linked: it tracks hurricane donation spending through a Jamaican agency. No connection to ports or shipping -->
<!-- archive: sawp-annual-review-jamaica-farm-workers-benefits-not-contract-2026 | read 18 Nov 2026 and not linked: it concerns Jamaican farm workers in a seasonal programme and what their benefits rest on. No connection to port capacity -->
<!-- archive: government-took-over-berbice-bridge-2018-still-paid-400-million-2026 | read 18 Nov 2026 and not linked: it covers the 2018 order transferring operation of the Berbice bridge and the later buyout. The buyout is linked above through the companion piece that carries the figures; linking both would state the same fact twice -->
<!-- archive: guyana-nis-berbice-bridge-906-million-maturities-2026 | read 18 Nov 2026 and not linked: it reports the pension scheme's holdings of Berbice Bridge Company paper and their maturity dates. That is a creditor question about the bridge, not about port capacity on the same river -->
The entities
- CGX Energy: operator of the Berbice River Port through its subsidiary, which signed the June 2026 customer agreement. - Grand Canal Industrial Estates Inc.: the CGX subsidiary that holds the port services agreement. - Cranes Guyana Inc.: the Muneshwers and John Fernandes joint venture investing more than US$285 million. - Chandradat Chintamani: general manager of Muneshwers Limited, who set the 18-month berth timetable. - Irfaan Ali: President of Guyana, who announced the private port at a community engagement in New Amsterdam. - Bechtel: the engineering firm that completed pre-front-end design for the government's deepwater port in 2023. - Bharrat Jagdeo: Vice President of Guyana, giving the feature address on 26 November 2026.
Frequently asked questions
Which Berbice port is operating?
CGX Energy's Berbice River Port, through its subsidiary Grand Canal Industrial Estates Inc., which signed a port services agreement effective 15 June 2026.
What does that agreement pay?
A minimum of US$64,000 a month before value-added tax, with a minimum annual throughput of 240,000 metric tonnes, running initially to 17 July 2027.
Who is building the US$285 million port?
Muneshwers Limited and John Fernandes Limited, through their joint venture Cranes Guyana Inc. It is expected to generate about 1,000 jobs.
Has that port broken ground?
No report of the sod-turning appears on OilNOW's Berbice Port tag, which runs from April 2025 to August 2026. President Ali said on 12 April 2025 it would happen within weeks.
What is the government's deepwater port for?
Guyana's second gas project. It is costed between US$1 billion and US$2 billion, and its next engineering stage is backed by a letter of interest rather than committed financing.
Why does this matter outside Guyana?
Guyana has for decades used ports in Trinidad and Jamaica for large cargo vessels. Capacity at Berbice moves that handling, and its fees, onshore.